Facts & Figures
|
Turnover 2010 |
TBP Group 7 million EURO |
|
Staff |
90 (entire TBP Group, excluding shareholdings) |
|
Capacity |
approx. 115.000 hours of engineering (entire TBP Group) |
|
Software |
ACAD 2D, Microstation 2D/3D, Intergraph PDS 2D/3D and SPPID, PDMS 2D/3D, ExtendTM, Flowmac, Caesar II, Comos, E-Plan |

Since 1995 out company has been complying with the quality assurance system according to ÖNORM EN ISO 9001.
The certificate can be downloaded from here:
ISO_Zertifikat TBP Engineering.pdf [63 KB]







