SCA Laakirchen - PM 11
Installation of graphic paper machine 11
Customer:
SCA-Graphic Laakirchen, Austria.
Project:
Installing a new SCA production line Annual capacity:
Stage 1: 240,000 tons/year
Stage 2: 360,000 tons/year
Includes:
Stock preparation, paper machine, calender, reel slitting machine, auxil. facilities.
Planning assignment:
Overall engineering (basic e. and detail engineering)
Plant engineering
Electrical engineering
Instrumentation and automation eng.
Project management

Scope of planning:
Engineering (abt. 65,000 hours)
Handling (abt. 30,000 hours)
Implementation period:
Basic engineering 5/2000 - 9/2000
Detail engineering 9/2000 - 9/2001
Start up 5/2002







