Projects & References Home » Projects & References Print

Reconstruction steam boiler

Reconstruction piping systems of existing steam boiler

 

TBP as sub-supplier

 

 

Project:
As-Built-Survey via 3D-Laserscanning and piping detail engineering 
 

Steam output: 250 tons/hour
 

 

Planning contract:

-  As-Built-Suvey via 3D-Laserscanning

-  As-Built-Modelling 3D (PDS)

-  Detailengineering for piping systems, steam distribution incl. stress analysis, calculation of piping and

   supporting components, cooling water and auxiliaries

 

Scope of planning:

Engineering: approx. 7.500 hours
 

 

Implementation period:
Engineering 02/2009 - 09/2009

Start up 12/2009
 