Reconstruction steam boiler
Reconstruction piping systems of existing steam boiler
TBP as sub-supplier
Project:
As-Built-Survey via 3D-Laserscanning and piping detail engineering
Steam output: 250 tons/hour
Planning contract:
- As-Built-Suvey via 3D-Laserscanning
- As-Built-Modelling 3D (PDS)
- Detailengineering for piping systems, steam distribution incl. stress analysis, calculation of piping and
supporting components, cooling water and auxiliaries
Scope of planning:
Engineering: approx. 7.500 hours
Implementation period:
Engineering 02/2009 - 09/2009
Start up 12/2009