Egger - Erection glue factory in Radauti
Detail engineering for a glue factory in Radauti (Romania)
Customer:
Fritz Egger GmbH & CoKG, St. Johann in Tirol - Austria
Project:
Name: Glue factory Egger Radauti
Yearly production: 200.000 tpy
Location: Romania
Start-up: 2011
Planning contract:
Detail engineering for the glue factory in Radauti with the following scope
- Civil guide drawings
- Arrangement drawings
- Cable tray drawings
- Tank guide drawings
- Piping drawings
- Stress analysis
- Isometrics
- Material reports
- Support drawings
- Procurement engineering for mechanical erection
- Erection engineering
Scope of planning:
Engineering: approx 9.500 hours
Implementation period:
Engineering: 12/2009 to estimated 07/2010







